Close

Login

Please login with your username and password.

Login

Can’t remember your accounts password?

Can't access your account?

Select your language

This page is available in the following languages:

    Please select your location

    ​Radisson Blu Hotel, Kuwait​​​

    What solution did we provide?​

    Master Builders Solutions offered the solution of strengthening the basement columns by jacketing using MasterEmaco® S443. MasterBrace® ADH 1414 was used as the bonding agent. The steel cages were protected with MasterEmaco® 8100AP. For shear walls, stainless steel plates were imbedded using the resin of MasterSeal® 915 or MasterBrace® ADH 2200 depending on the thicknesses required. Shear walls were repaired and made level by using MasterEmaco® N907 with anti- carbonation properties. MasterTop® 548 and MasterTop® 500 were used for screeding and leveling in areas where traditional screed could not meet the low thickness requirements. To level the floor, MasterTop® 528 was applied on top of MasterTop® 548. MasterTop® 528 was also used in other areas where the requirement was for an underlayment thickness of up to 5mm. Efficient watering of the substrate and covering of the screeds with plastic sheets directly after application ensured sufficient hydration (strength) for low application thickness and temperature conditions. MasterTile® RSG 705 was used as a tile grout in the cold room, kitchens and food areas due to its durability, hygienic characteristics and resistance to low temperatures.

    Project: Radisson Blu Hotel Renovation

    Location: Kuwait

    Project completed: 2013​​

    Products used: Concrete Repair Systems, Floor Underlayment Screeds, Tiling​

    For more information please click here​​​

     

    Contacts

    UAE:
    (Monday/Wednesday/Friday)
    +971/526722502
    (Saturday/Tuesday/Thursday)
    +971/526722371
    --------------------------
    Oman: +968/24435800
    --------------------------
    More Locations & Distributors