Close

Login

Please login with your username and password.

Login

Can’t remember your accounts password?

Can't access your account?

Select your language.

This page is available in the following languages:

    Please select your location

    ​​​​​​Foundation Engineering Project References


    Padgett-Thomas Barracks - The Citadel, Charleston, SC

    Constructed in 1922, the Padgett-Thomas Barracks was the oldest building, the largest student housing facility perhaps the best-known symbol of the military college. By 2000, however, it was declared a safety hazard with collapsed ceilings, fallen concrete, backed-up sewer lines and structural instability. In the early part of 2000, the decision was made to demolish and replace the Padgett-Thomas Barracks with a new structure, identical in appearance to the landmark building but incorporating modern conveniences.         

    View the complete project profile

    Binghamton University East Campus Housing , Phase Two - Binghamton, NY

    In August 2009, Binghamton University  embarked on a project to replace its aging  dormitories with new, up-to-date facilities.  One of the objectives for rebuilding rather than retrofitting was to modernize the campus dormitories and boost curb appeal, an important factor for colleges.

    View the complete project profile

    Trump International Hotel & Tower - Chicago, IL

    The mat foundation for the Trump International Hotel and Tower in Chicago measured 198 ft (60 m) in length, 60 ft (18 m) in width and 10 ft (3 m) in depth, and required approximately 5,000 yd3 (3,800 m3) of concrete.

    View the complete project profile

    ​​​

    Fort Drum Connector Bridge Beams - Jefferson County, NY

    The concrete specified for the 100' x 84" high beams fell under the New York State Department of Transportation (NYSDOT) high-performance concrete specifications, which requires the use of 5 gal/yd3 (25 L/m3) of a calcium nitrite-based corrosion-inhibiting admixture. The concrete had to achieve a compressive strength of 8,500 psi (58.6 MPa) in 34 hours and 10,100 psi (69.6 MPa) at 28 days in order for New Enterprise to meet scheduling requirements. 


    View the complete project profile 



    Additional Institutional Structures Project References List​

    United HealthGroup Facility - Eden Prairie, MN 

    US Federal Courthouse - Bakersfield, CA​​

    MMC Natural Gas Compressor Pad - Jackson, MS

    Woodward West Skate Park - Tehachapi, CA