Close

Login

Please login with your username and password.

Login

Can’t remember your accounts password?

Can't access your account?

Select your language.

This page is available in the following languages:

    Please select your location

    ​​Strength on Demand Project References



    I-75 Rehabilitation - Ohio/Kentucky Border

    Replaced concrete sections of a high-traffic interstate highway on each of 16 week-ends to minimize lane closure time. Due to logistics of the dangerous and crowded construction zone, all the admixtures had to be dispensed at the concrete batch plant.

    View the complete project profile

    I-93 Rapid Bridge Replacements - Medford, MA

    14 bridges on Interstate 93, where the traffic volume is 200,000 cars per day, needed replacement due to deterioration of the concrete. Using normal construction procedures, this project would have taken at least five years to complete. In order to accelerate the project and minimize the impact on commuters, accelerated project development and construction techniques were used.          

    View the complete project profile

    I-44 Pavement Repairs - Missouri

    This was a full-depth pavement replacement project along Interstate 44 in three counties in Missouri.  To minimize commuter inconvenience, all work had to be performed daily between 11 PM and 6 AM.  Substantial penalties would be assessed by the Missouri Department of Transportation for delay in re-opening the highway for traffic. 

    View the complete project profile

    I-5 "Boat Section" Replacement - Sacramento River, CA

    California’s Interstate 5 is the main north-south  highway on the West Coast. The three-quarter mile stretch of I-5 along the Sacramento River is often referred to as the “Boat Section” since it lies below water level and required draining of the area when it was originally built in the 1960s. Since then, the Boat Section has been plagued by river silt and sand blockages in its drainage system, which allowed water to be pushed up through the pavement and cause cracking and deterioration. Replacement of the Boat Section was critical to better accommodate the nearly 200,000 trucks and motorists that drive the stretch daily.

    View the complete project profile

    I-77 / I-64 Lane Replacement - Beckley, WV

    Several stretches of the I-77/I-64 West Virginia turnpike were in need of replacement. The turnpike commission was interested in a fast-track replacement of the deteriorated lanes to minimize inconvenience to motorists.  This required a ready-mixed concrete mixture that would achieve the required compressive strength even in the cool springtime ambient temperatures.

    View the complete project profile

    Highway 140 Intersection Replacement - Merced County, CA

    General Contractor, W. Jaxson Baker Inc., was challenged with replacing an entire asphalt intersection with concrete within one week. The challenge was issued by CalTrans to minimize disruption to traffic flow and lane closures. 

    View the complete project profile

    Alamo Truck Stop Weigh Scale - Sparks, NV

    The Alamo truck stop weigh scale in Sparks, Nevada is a major source of revenue for the city. An estimated 43,800 big-rig tractor-trailers, weighing approximately 150,000 to 160,000 lb (68,180 – 72,730 kg) each, use the annually to accurately determine their load. The asphalt around the approach and exit areas of the scale ruts severely due to the constant low-speed start-and-stop truck traffic entering and exiting the scale and historically has been repaired on an annual basis.

    View the complete project profile

    Interstate Lane Replacement in Sub-Zero Temperatuers - Vacaville, CA

    View the complete project profile